Skip to main content

Cross River
Rail Link

CPB, Ghella & UGL JV 2019

Andrew, Director of Substrata Group, led the team from sister company GHE Group in partnering with CPB, Ghella & UGL JV to supply earthmoving and specialised tunnelling equipment for Brisbane’s largest rail infrastructure project. The team provided a comprehensive range of high-tech equipment, including tunnelling road header excavators equipped with hammers and profiling heads, operating 24/7 at the Boggo Road site. They also supplied specialised machinery for efficient operation in tight, confined spaces, small drives, and cross passage drives. Andrew’s team ensured that all equipment met rigorous standards and challenges, adapting swiftly to changing conditions and demonstrating exceptional technical expertise. Their support was crucial in maintaining the project’s momentum and productivity, ensuring smooth operations and adherence to the schedule. This involvement highlighted their ability to handle large-scale, complex projects and underscored their commitment to operational efficiency and reliability.

"We achieved exceptional results in the most challenging ground conditions within shafts and driven tunnels. Tackling the toughest terrain with remarkable reliability and efficiency, we showcased our capabilities to a highly satisfied client."
Andrew Predika
Managing Director

TALK TO US ABOUT YOUR NEXT PROJECT